Preventive maintenance supports performance and uptime
Preventive maintenance (PM) programs for your Biacore system support your research outcomes. Routine maintenance reduces equipment breakdown and the need for costly repairs.
Scheduled maintenance tunes your instrument to meet your goals in quality, speed, accuracy, and productivity.
INCLUDED TESTS AND PARTS
Extensive set of 50 tests and inspections | |
---|---|
System check | Rack drive unit verification |
Pneumatic control unit test | Temperature control verification |
Liquid system operation verification | Optical unit and docking inspection |
Autosampler lubrication and calibration | Pump mechanism cleaning and lubrication |
Syringe maintenance | Chip insertion verification |
Verification of Biacore control software | |
Parts replaced during PM | |
Integrated μ-fluidic cartridge (IFC) | Optical interface |
Syringe maintenance kit | Peristaltic pump tubing |
Recommended interval | |
Our standard recommended PM frequency is two visits per year if: - Instrument usage is high - Organic solvents are being used - Instrument is used in a multi-user environment |
|
Note: Parts replaced during PM may vary from model to model. If your Biacore system is not covered by a service agreement, any part replaced other than a wear part will incur additional charges. |