akta avant and akta pure
scientist-configuring-akta-avant-research-system
INCLUDED TESTS AND PARTS
Extensive set of 50 tests and inspections
Pump inspection and wear parts replacement Pump pulsation testing
Valve switching and positioning UV lamp intensity test
Fraction collector operation (fraction collector box and arm) Pressure sensor alarm
Liquid system inspection and cleaning Mixer inspection
Updates to the latest instrument configuration Review of service error log
Operational check of computer and UNICORN software
Parts replaced during PM
Pump seals Membranes for pump rinsing
O-rings In-line and inlet filters
Recommended interval
Our standard recommendation is one PM visit per year. Your OptiRun service team can advise on the optimal frequency for your needs.