INCLUDED TESTS AND PARTS
Extensive set of 50 tests and inspections | |
---|---|
Pump inspection and wear parts replacement | Pump pulsation testing |
Valve switching and positioning | UV lamp intensity test |
Fraction collector operation (fraction collector box and arm) | Pressure sensor alarm |
Liquid system inspection and cleaning | Mixer inspection |
Updates to the latest instrument configuration | Review of service error log |
Operational check of computer and UNICORN software | |
Parts replaced during PM | |
Pump seals | Membranes for pump rinsing |
O-rings | In-line and inlet filters |
Recommended interval | |
Our standard recommendation is one PM visit per year. Your OptiRun service team can advise on the optimal frequency for your needs. |