INCLUDED TESTS AND PARTS
| Extensive set of 50 tests and inspections | |
|---|---|
| Pump inspection and wear parts replacement | Pump pulsation testing |
| Valve switching and positioning | UV lamp intensity test |
| Fraction collector operation (fraction collector box and arm) | Pressure sensor alarm |
| Liquid system inspection and cleaning | Mixer inspection |
| Updates to the latest instrument configuration | Review of service error log |
| Operational check of computer and UNICORN software | |
| Parts replaced during PM | |
| Pump seals | Membranes for pump rinsing |
| O-rings | In-line and inlet filters |
| Recommended interval | |
| Our standard recommendation is one PM visit per year. Your OptiRun service team can advise on the optimal frequency for your needs. |