预防性保养支持性能和正常运行时间
Biacore 系统的预防性保养 (PM) 计划可为您的研究结果提供支持。定期保养可减少设备故障和昂贵维修。
主动的预防性保养可帮助您的设备在质量、速度、准确度和生产力方面均达到您的要求。
INCLUDED TESTS AND PARTS
Extensive set of 50 tests and inspections | |
---|---|
System check | Rack drive unit verification |
Pneumatic control unit test | Temperature control verification |
Liquid system operation verification | Optical unit and docking inspection |
Autosampler lubrication and calibration | Pump mechanism cleaning and lubrication |
Syringe maintenance | Chip insertion verification |
Verification of Biacore control software | |
Parts replaced during PM | |
Integrated μ-fluidic cartridge (IFC) | Optical interface |
Syringe maintenance kit | Peristaltic pump tubing |
Recommended interval | |
Our standard recommended PM frequency is two visits per year if: - Instrument usage is high - Organic solvents are being used - Instrument is used in a multi-user environment |
|
Note: Parts replaced during PM may vary from model to model. If your Biacore system is not covered by a service agreement, any part replaced other than a wear part will incur additional charges. |